WATERPROOFING ESTIMATING
Assembly-level takeoffs for below-grade, above-grade, and deck systems — quantified in 24–48 hours.
- 24–48h
- Turnaround
- ±2%
- Accuracy
- 10
- Trades

Below-grade foundation membrane installation
WHERE WATERPROOFING BIDS FAIL
Specification conflicts and uncounted transitions swallow contractor margins before breaking ground.
Details vs Specs
Wall sections call one membrane, specs call another. Swings cost up to 40%.
Uncounted Transitions
Reglets, terminations, and drainage boards frequently go uncounted.
Coverage Assumptions
Laps and waste percentages handled by gut feel instead of manufacturer TDS.
Lack of Audit Trail
No color-coded plan backup when GCs question price changes on bid day.
WHAT WE QUANTIFY
Assembly-level takeoffs formatted directly to bid, price, and buyout.
Below-Grade Systems
Foundation walls, mat slabs, and elevator pits by exposed area.
- Sheet & Fluid
- Bentonite
- Drainage Board
Air & Vapor Barriers
Wall area by substrate with transition membranes isolated.
- Fluid AVB
- Self-Adhered
- Opening Detail
Traffic Deck Coatings
Parking structures and plaza decks split by traffic wear course.
- Vehicular / Pedestrian
- Ramps & Turns
- Curbs
Joints & Terminations
Expansion joints, sealant LF, and backer rod counts by width.
- Expansion Profiles
- Linear Feet
- Reglets
Surface Remediation
Grinding, shot blasting, and crack routing isolated for labor.
- Shot Blasting
- Crack Routing
- Moisture Test
Access & Phasing
Lift durations, staging logistics, and building area phasing.
- Swing Stage
- Shoring
- Phasing
BID 2X FASTER
Turnaround in 24–48 hours to chase more opportunities.
BID TIGHTER
Documented coverage math replaces arbitrary padding.
DEFEND SCOPE
Color-coded plan markups prove your numbers to GCs.
SCALE CAPACITY
Surge capacity for bid season without adding fixed overhead.
CLEAN BUYOUT
Quantities map directly into POs and subcontract exhibits.
STAY CONSISTENT
Standardized report formats on every project bid.
HOW WE WORK
Four predictable steps, backed by a named deliverable at every stage.
-
01
Intake
Submit PDF plans and Division 07 specs. Scope confirmed upfront.
SCOPE CONFIRMED -
02
Review
Details & specs reconciled. Conflicts logged as RFIs before takeoff.
RFI LOG -
03
Takeoff
Assembly-level measurement with color-coded plan markups.
MARKED-UP PLANS -
04
Delivery
Unlocked Excel workbook delivered with a walkthrough call.
BID PACKAGE
EXPERIENCE BEHIND THE WORK

Mixed-Use Podium
Below-grade membrane, mat slab, elevator pits

Municipal Garage
Vehicular traffic coating & expansion joints

Hospital Plaza Deck
Hot fluid-applied membrane & planters
TRADE-EXPERIENCED ESTIMATORS
We are estimators and project engineers with trade field experience, not data-entry clerks.
- Waterproofing field & PM background
- Assembly-level detail, no lump-sum guesses
- Documented manufacturer coverage rates
- Color-coded marked-up plan sets included
- RFI log surfacing drawing conflicts
- Formats structured directly for buyout

PLANS TO PRECISION
Every quantity is traceable directly to drawing details, sections, and TDS coverage math.
- Assembly takeoff workbook
- Color-coded marked-up plan set
- Assumption & exclusion register
- RFI log for spec conflicts
- Labor-hour summary
- Bid-form summary sheet
- MEASUREMENT
- Exposed Area / LF
- SOFTWARE
- OST & Bluebeam
- FORMATS
- Unlocked Excel & PDF
- COVERAGE
- Per Manufacturer TDS
FREQUENT QUESTIONS
READY TO BID YOUR NEXT PROJECT?
Upload your drawings. We confirm scope and pricing before work starts.




