Hollow Metal Doors & Frames
16-gauge and 18-gauge welded and knockdown steel frames, masonry anchors, drywall stud anchors, and flush metal doors.
Comprehensive Division 08 opening counts, hollow metal frame takeoffs, and architectural hardware schedule audits — delivered in 24–48 hours.

Hollow metal frame, wood door, and hardware schedule takeoff
Door schedule conflicts, misread hardware sets, and overlooked electrical prep components generate costly change orders during door installation.
Floor plan opening marks calling out swing doors while schedules list pair openings or missing frame throat dimensions.
Door closers, kick plates, wall stops, thresholds, and perimeter gasketing left out of hardware set pricing summaries.
Electrified panic hardware, power transfers, and electric strikes quoted as standard mechanical hardware without raceway costs.
20-minute to 90-minute fire-rated door assemblies requiring specialized vision lites and ceramic glass unflagged.
Complete Division 08 opening schedules cross-referenced by door material, frame type, fire rating, and hardware set.
16-gauge and 18-gauge welded and knockdown steel frames, masonry anchors, drywall stud anchors, and flush metal doors.
Solid core wood doors, particleboard core, mineral core fire-rated doors, stain-grade veneers, and plastic laminate finishes.
Comprehensive hardware set line-item counts including hinges, locksets, latchsets, flush bolts, and coordinators.
Rim and surface vertical rod panic exit devices, heavy-duty surface door closers, and overhead concealed stops.
Electric strikes, motorized latch retraction devices, power transfers, magnetic locks, and card-access integration hardware.
Glazing vision frames, ceramic fire-rated glass, aluminum thresholds, automatic door bottoms, and weatherstripping kits.
Turnaround in 24–48 hours to chase more commercial opening packages.
Itemized hardware counts eliminate general lump-sum opening guesses.
Color-coded opening markups cross-referenced directly with door schedules.
Surge capacity for large commercial subcontracts without expanding overhead.
Standardized Excel opening matrices matching distributor software formats.
Four predictable steps, backed by a named deliverable at every stage.
Submit floor plans, door schedules, elevation drawings, and Division 08 specs. Scope confirmed upfront.
SCOPE CONFIRMEDOpening mark vs schedule reconciled. Fire labels and hardware set conflicts logged as RFIs.
RFI LOGEach door opening digitized with color-coded tags by frame type and hardware set number.
MARKED-UP PLANSExcel opening schedule matrix with complete hardware itemization delivered with a review call.
BID PACKAGE
Welded hollow metal frames, walnut architectural wood doors, card-access locks

90-minute fire-rated steel doors, stainless steel protection plates, delayed exit devices

Heavy-duty mortise locksets, continuous gear hinges, surface closers, kick plates
Our door and hardware estimators understand Division 08 specifications and hardware schedule coding to guarantee exact counts.

Every door opening is counted, cataloged, and cross-referenced with specification requirements.
Upload your drawings. We confirm opening counts and hardware sets before work starts.