Construction crew on an active building site
24–48 HR TAKEOFF QUEUE ACTIVE • COMPREHENSIVE ESTIMATING SUPPORT

Precision Estimating For Construction Projects.

Accurate, bid-ready quantity takeoffs and pre-construction estimating for general contractors, subcontractors, builders, and developers — waste factors, itemized assemblies, and plan markups included.

24–48h Delivery PlanSwift & Bluebeam Net vs Gross Formulas
LIVE TAKEOFF SUITE // PROJECT AUDIT
ACTIVE QUEUE
Architectural takeoff plan audit and specification review PLAN-TRACE • SPECIFICATION VERIFIED 24–48 HRS
Turnaround
24–48 HRS
Scope Coverage
FULL SCOPE
Deliverable
BID-READY
Specification-audited against project drawings, notes & scope schedules
Substrate prep, transitions, waste factors & assemblies itemized
Itemized Excel formulas + PlanSwift / Bluebeam markups
02 — METHODOLOGY & EXPERTISE

Your Trusted Partner InConstruction Estimating.

Most estimating support simply measures basic drawing dimensions. P2C reads the full specification behind the plans — the substrate condition, the joint width, the assembly build-up, and the flashing detail — because that is where true construction cost lives.

Whether you are a general contractor bidding a full package, a trade subcontractor bidding specialized scope, or a project developer planning budgets, we separate net installed area from gross ordered quantities so your team operates with complete certainty.

Project Specification Audit: All assemblies verified against architectural drawings, structural sheets, and project specifications.
Transparent Quantities: Net vs. gross formulas separated with realistic waste factors for accurate bidding and procurement.
About P2C Estimating Services
Architectural blueprint drawings with scale rule and dimension callouts
PLAN-TRACE & SPEC AUDIT
Net vs Gross
Split on Every Package
Assemblies & Prep
Quantified Separately
Scope Gaps
Flagged Before Bid
SERVICES & SCOPE • COMPREHENSIVE ESTIMATING

Specialized Trade Expertise. One Estimating Standard.

From individual trade packages to multi-trade pre-construction takeoffs, our experienced estimators deliver specification-matched quantities with waste factors, assembly breakdowns, and bid-ready spreadsheets.

FILTER DIVISION:
P2C SCOPE WORKSTATION
24–48 HR BID QUEUE ACTIVE
Commercial waterproofing assembly installation Applicator applying joint sealant to a commercial facade Commercial single-ply membrane roofing installation Commercial hollow metal door and frame hardware assembly Commercial flooring installer laying modular carpet and tile Concrete technician applying chemical densifier and sealer Diamond floor polishing equipment on a commercial slab Resinous epoxy flooring application on an industrial floor Commercial painter spraying structural steel and interior walls Metal stud framing and gypsum wallboard installation
DIVISION 07 • CSI 07 10 00
24–48 HR
TRADE 01 — WATERPROOFING

Waterproofing

Complete below-grade, blindside, split-slab, and above-grade waterproofing takeoffs with perimeter tie-ins, transitions, and protection boards — delivered in 24–48 hours.

WHAT WE QUANTIFY & DELIVER
Sheet, bentonite, hot-applied and cold fluid-applied membrane takeoffs
Drainage composite, insulation, and protection board calculations
PlanSwift / Bluebeam Excel Takeoff Sheets Bid-Ready Summary

04 — The P2C difference

Precision is aprocess, not a promise.

06 — Process

From drawing set to bid-ready package

Interior of a commercial building under construction with finished drywall partitions

07 — Start a project

Send your plans.We will handle the quantities.

Scroll to Top