
Precision Estimating For Construction Projects.
Accurate, bid-ready quantity takeoffs and pre-construction estimating for general contractors, subcontractors, builders, and developers — waste factors, itemized assemblies, and plan markups included.
PLAN-TRACE • SPECIFICATION VERIFIED
⚡ 24–48 HRS- Turnaround
- 24–48 HRS
- Scope Coverage
- FULL SCOPE
- Deliverable
- BID-READY
Project-Tailored Scope
Quantified strictly by assembly & spec, built to your exact project requirements.
Multi-Trade Coverage
Supporting general contractors, trade subcontractors, developers, and builders across diverse scopes.
24–48 Hour Delivery
Fast turnaround packages delivered well within your tight bid deadline window.
Bid-Ready Format
Itemized net & gross quantities structured in Excel for immediate estimating & buyout.
Your Trusted Partner InConstruction Estimating.
Most estimating support simply measures basic drawing dimensions. P2C reads the full specification behind the plans — the substrate condition, the joint width, the assembly build-up, and the flashing detail — because that is where true construction cost lives.
Whether you are a general contractor bidding a full package, a trade subcontractor bidding specialized scope, or a project developer planning budgets, we separate net installed area from gross ordered quantities so your team operates with complete certainty.

- Net vs Gross
- Split on Every Package
- Assemblies & Prep
- Quantified Separately
- Scope Gaps
- Flagged Before Bid
Specialized Trade Expertise. One Estimating Standard.
From individual trade packages to multi-trade pre-construction takeoffs, our experienced estimators deliver specification-matched quantities with waste factors, assembly breakdowns, and bid-ready spreadsheets.

Waterproofing
Complete below-grade, blindside, split-slab, and above-grade waterproofing takeoffs with perimeter tie-ins, transitions, and protection boards — delivered in 24–48 hours.
04 — The P2C difference
Precision is aprocess, not a promise.
Estimators who know construction
Packages are built by estimators familiar with real field installation and trade sequences, not generic measurement algorithms.
Waste and pattern factors applied
Modular tile, sheet goods, board stock and roll goods order differently. We account for cutting waste and layout at takeoff.
Substrate and preparation isolated
Grinding, moisture mitigation, patching, priming and underlayment are itemized as separate line items.
Scope gaps flagged early
Missing details, conflicting notes and unclear transitions are identified early so you can clarify before bid submission.
Assemblies & Scopes We Quantify
Representative work across building envelope, openings, structural concrete & interior finishes.
06 — Process
From drawing set to bid-ready package
- 01
Send plans
Share your drawing set, specification documents and target bid date.
- 02
Scope project
We confirm the scope boundaries, required trade packages and any drawing conflicts.
- 03
Build estimate
Quantities are measured by assembly with waste factors, prep, and materials isolated.
- 04
Quality review
A senior review verifies coverage, units, formulas, and checks for any scope gaps.
- 05
Deliver package
A bid-ready package with marked plans and Excel sheets is returned in 24–48 hours.

07 — Start a project
Send your plans.We will handle the quantities.
- Phone
- +1 469-401-1711





