Portfolio Six Completed Packages Commercial & Industrial

Real Bids.
Real Turnaround Times.

Six packages delivered to contractors in Texas, California and beyond. Each one lists the trades taken off, the quantities returned, and how long it took — so you can judge the work rather than the pitch.

Fastest Takeoff
4 Hours
Largest Scope
2.3M SF
Live Bid Enabled
$1M In 1 Day
Delivery Format
Excel + Revu

Fig. 01 — Project Spotlight & Estimating Overview

01 — At A Glance

What each package took, and what it took us.

Every package was delivered in the software the client already worked in. We adapt to your process rather than asking you to adopt ours.

Sample projects summary table with trade scope, turnaround time, and delivery format
ProjectTrade ScopeTakeoff TimeDelivered In
Texas Middle School → Envelope & waterproofing (Div 07)3 daysExcel + Markup
Technology Center → All 5 building divisions (Arch to MEP)5 daysBluebeam Revu + Excel
Confidential Warehouse → Concrete & resinous floors (Div 03/09)8 hoursExcel + Markup
Retail Space → Commercial flooring & tile (Div 09)4 hoursPlanSwift + Excel
Multi-Family Residential → Waterproofing & air barrier (Div 07)24 hoursBluebeam Revu + Excel
Site Improvements → Concrete & sitework (Div 02/03)8 hoursBluebeam Revu + Excel
02 — Sample Packages

Six projects, in detail.

Explore real takeoff scopes, quantified items, turnaround milestones, and deliverables.

Project 01 Education Div 07
3 Days

Texas Middle School

Full building envelope takeoff for a Texas-based waterproofing contractor bidding a $1 million package — air barrier, insulation, flashing, sealants and firestopping.

Location
Dallas, Texas
Client
Waterproofing contractor
Bid Value
$1 million
Quantities Returned
Air Barrier & Insulation ~80,000 SF
Exterior Caulking ~10,000 LF
Outcome: Takeoff and pricing completed in 3 days at less than half in-house cost.
Project 02 Education / Tech All Divisions
5 Days

Technology Center

A complete multi-division takeoff for a Texas general contractor on a two-storey, 66,000 SF technology education center — architectural through plumbing.

Location
San Antonio, Texas
Client
General contractor
Building
2 storeys · 66,000 SF
Quantities Returned
Gross Floor Area 66,000 SF
Divisions Quantified 5 scopes
Outcome: Full takeoff across 5 divisions in 5 days, freeing estimators for higher-level work.
Project 03 Industrial Div 03/09
8 Hours

Confidential Warehouse

Rapid concrete and resinous floor takeoff for a Michigan contractor bidding a $1 million package in California — 2.3M SF RSP grinding, sealed concrete, polished concrete, and epoxy.

Location
California
Client
Concrete & epoxy contractor
Bid Value
$1M (1-day submit)
Quantities Returned
RSP Platform Grinding 2,300,000 SF
Sealed Concrete 650,000 SF
Outcome: Takeoff completed in 8 hours, allowing a $1M bid submission within 1 day.
Project 04 Retail Div 09
4 Hours

Retail Space

Urgent commercial flooring takeoff for a Dallas flooring contractor on a Houston retail facility — carpet, porcelain, ceramic, vinyl, static dissipative tile, and transitions.

Location
Houston, Texas
Client
Flooring contractor
Priority
Urgent bid turnover
Quantities Returned
Commercial Carpet 14,000 SF
Porcelain Tile 3,700 SF
Outcome: 4 hours from drawings to finished takeoff in PlanSwift and Excel.
Project 05 Multi-Family Div 07
24 Hours

Multi-Family Residential

Comprehensive envelope and moisture protection takeoff for a waterproofing contractor in Frisco, Texas — 100,000 SF air barrier, 32,000 LF joint sealants, and 18,000 LF flashing.

Location
Frisco, Texas
Client
Waterproofing contractor
Client Effort
5 hours total
Quantities Returned
Air Barrier Assembly 100,000 SF
Joint Sealants 32,000 LF
Outcome: 24-hour turnaround with only 5 hours of client estimating effort.
Project 06 Sitework / Concrete Div 02/03
8 Hours

Site Improvements

Comprehensive concrete and sitework takeoff for a Southern California contractor on a commercial development in Riverside — 31,000 SF pavement, 2,000 SF slab on grade, CMU walls, and rebar.

Location
Riverside, California
Client
Concrete contractor
Bid Window
Submitted in 1 day
Quantities Returned
Concrete Pavement 31,000 SF
Slab on Grade 2,000 SF
Outcome: 8 hours from receipt to delivered package, enabling next-day bid submission.
03 — Deliverables

The same four pieces, every time.

Whatever the trade or turnaround time, the deliverable is built the same way — checkable, structured, and ready for your unit pricing.

01

Quantity Workbook

Unlocked Excel, broken out by assembly the way your bid form is structured, with formulas left live for your unit costs.

02

Marked-Up Drawings

Your set marked in high-visibility colour. Every quantity ties back to a sheet, so numbers can be verified in seconds.

03

Net & Gross Split

Installed area separated from ordered quantity, so estimating and procurement work from clean, aligned numbers.

04

Assumption Notes

Where drawings are incomplete, every assumption is written down so you can qualify it in the bid rather than discover it later.

Your project

Send a live set. Check our numbers against yours.

Tell us the trade and the bid date. An estimator confirms scope before work starts, and flags drawing conflicts rather than guessing past them.

Request an estimate Text Us for a Free Sample Takeoff

Mon–Fri, 8am–6pm CT · +1 469-401-1711

Scroll to Top