TRADE 06 — SEALED CONCRETE

SEALED CONCRETE ESTIMATING

Quantified concrete sealing takeoffs for warehouse slabs, parking decks, and commercial floors — delivered in 24–48 hours.

24–48h
Turnaround
±2%
Accuracy
100%
Coverage Audited
DIVISION 03 / 09 Commercial sealed concrete floor treatment and penetrating sealer application

Penetrating silane/siloxane & chemical densifier sealing takeoff

OVERVIEW

WHERE CONCRETE SEALING BIDS FAIL

Ignoring concrete porosity, miscalculating coat coverage rates, and failing to quantify slab cleaning prep cause bid-day profit leaks.

01 POROSITY VARIATION

Coverage Rate Assumptions

A broom finish can absorb twice the sealer a hard-troweled slab does - Estimate off the wrong profile and you're a full coat short

OVERLOOKED SLAB PREP

Cleaning & Scrubbing

Auto-scrubbing, laitance removal, and oil stain degreasing labor uncalculated prior to liquid sealer spray application.

03 COAT COUNT OMISSIONS

Single vs Double Coat

Specifications requiring a prime coat plus topcoat priced as a single pass.

04 JOINT SEALANT CONFLICTS

Control Joint Compatibility

Saw-cut control joint filling and joint prep uncoordinated with penetrating sealer chemical schedules.

SCOPE OF WORK

WHAT WE QUANTIFY

Complete concrete sealer takeoffs itemized by chemical type, application coats, and surface prep requirements.

03 35 00

Slab Areas by Treatment

Interior and exterior slab areas separated by specified sealer system.

  • Interior
  • Exterior
  • By Room
03 35 13

Densifiers

Lithium, sodium and potassium silicate densifiers by published coverage rate.

  • Lithium
  • Silicate
  • Coverage Rate
07 19 00

Sealers & Coatings

Acrylic, urethane and penetrating sealers by coat count and finish sheen.

  • Acrylic
  • Penetrating
  • Sheen Level
03 01 30

Surface Preparation

Grinding, shot blasting, scarifying and residue removal by affected area.

  • Shot Blasting
  • Grinding
  • Residue
03 15 00

Joint & Crack Treatment

Control joint fill, routing and repair measured by linear foot and width.

  • Joint Fill
  • Crack Routing
  • Repair
01 20 00

Access, Phasing & Protection

Occupied-area phasing, containment, protection and cure time impact.

BID 2X FASTER

Turnaround in 24–48 hours to pursue more commercial concrete sealing contracts.

BID TIGHTER

Gallon yield math calculated against specific concrete surface finish profiles.

DEFEND SCOPE

Color-coded plan markups separating interior densifier, exterior silane, and joint filling.

SCALE CAPACITY

Surge capacity for bidding large industrial warehouse & logistics facility floors.

STAY CONSISTENT

Standardized Excel files formatted for Prosoco, Euclid, and Laticrete chemical orders.

PROCESS

HOW WE WORK

Four predictable steps, backed by a named deliverable at every stage.

  1. 01

    Intake

    Submit site plans, floor plans, concrete finish schedules, and Division 03/09 specs. Scope confirmed upfront.

    SCOPE CONFIRMED
  2. 02

    Review

    Concrete surface profile (CSP) requirements and chemical spec compatibility reviewed. RFIs logged.

    RFI LOG
  3. 03

    Takeoff

    Slab surface area digitized in Planswift with separate layer counts for coats and joint filling.

    MARKED-UP PLANS
  4. 04

    Delivery

    Excel takeoff workbook with chemical gallon totals and surface prep labor delivered with a walkthrough call.

    BID PACKAGE
PROJECT PROOF

EXPERIENCE BEHIND THE WORK

Completed large logistics warehouse floor with clean sealed concrete finish
350,000 SF

Logistics Warehouse Hub

Lithium silicate densifier, 2-coat penetrating sealer, semi-rigid polyurea joint filler

Commercial parking structure featuring a protective sealed concrete slab floor
180,000 SF

Airport Parking Deck

40% silane penetrating sealer, traffic deck joint sealants, concrete pressure wash prep

Architectural close-up view of professionally sealed concrete floor showing aggregate texture
45,000 SF

Commercial Retail Center

Water-based acrylic cure and seal, dustproofing, auto-scrubber prep

WHY P2C

TRADE-EXPERIENCED ESTIMATORS

We are concrete restoration and sealing estimators who calculate exact chemical coverage rates per manufacturer TDS sheets.

  • Concrete chemical sealer field & PM experience
  • TDS-backed gallon yield math based on slab profile
  • Polyurea control joint filler LF breakdown
  • Color-coded slab area markups in Bluebeam
  • RFI log flagging sealer chemistry & curing compound conflicts
  • Excel exports formatted for direct chemical supplier purchasing
Architectural CAD technical detail drawing showing concrete floor slab sealing system cross-section
DELIVERABLES

PLANS TO PRECISION

Every gallon of concrete sealer and linear foot of joint filler is traceable directly to drawing finish schedules.

  • Slab surface area & gallon yield workbook
  • Color-coded floor plan markups
  • Chemical gallon & 55-gal drum calculator
  • Saw-cut control joint filler LF schedule
  • RFI log for spec discrepancies
  • Bid-day chemical order export sheet
MEASUREMENT
Square Feet (SF) / Gallons
SOFTWARE
Planswift & Bluebeam
FORMATS
Unlocked Excel & PDF
YIELD BASIS
Per Manufacturer TDS
FAQ

FREQUENT QUESTIONS

We match the specified sealer product's technical data sheet (TDS) against the specified concrete finish profile (hard-troweled vs broomed), calculating exact gallon requirements plus a 5–10% application waste factor.

Penetrating sealers (silane/siloxane/silicates) absorb into concrete pores without changing surface texture, while film-forming acrylics create a surface sheen; we separate labor equipment and material costs accordingly.

Yes. Auto-scrubbing, degreasing, and surface neutralization labor are itemized as separate line items prior to sealer application.

We require architectural floor plans, slab finish schedules, structural slab notes, site paving sheets, and Division 03/09 spec sections.

Standard commercial sealed concrete takeoff packages are completed in 24–48 hours depending on building size.
NEXT STEP

READY TO BID YOUR NEXT SEALED CONCRETE PROJECT?

Upload your drawings. We confirm slab surface areas and chemical yield rates before work starts.

Scroll to Top