Multi-Family Residential
Comprehensive envelope and moisture protection takeoff for a waterproofing contractor in Frisco, Texas — 100,000 SF air barrier, 32,000 LF joint sealants, and 18,000 LF flashing delivered in 24 hours.
- Location
- Frisco, TX
- Client
- Waterproofing contractor
- Client Effort
- 5 hours total
- Takeoff Time
- 24 hours
Fig. 01 — Project spotlight
What we took off.
Complete exterior building envelope and moisture protection assemblies quantified against multi-family architectural drawings and detail callouts.
- Below Grade Waterproofing
- Fluid-Applied Air Barrier
- Sheet Metal Flashing
- Firestopping
- Joint Sealants
What came back.
High-volume envelope scopes measured and categorized by substrate and detail location for straightforward vendor quoting.
- Bluebeam Revu
- Microsoft Excel
Delivered using the client’s standard toolsets for immediate audit and bid incorporation.
24-hour turnaround, saving 80% of in-house time.
P2C completed the total takeoff in 24 hours, allowing the contractor’s in-house estimator to spend only 5 hours on the entire effort as P2C carried the heavy load.
The project takeoff was completed and communicated to the client utilizing their preferred method of Bluebeam Revu and MS Excel.
Fast Results
P2C delivered detailed takeoff reports in just 24 hours, keeping fast-paced bidding schedules on track without missing a deadline.
Saves Time and Effort
Handling the heavy takeoff load allowed the contractor’s estimator to spend only 5 hours on the project, freeing capacity for other bids.
Easy Communication
Delivered in Bluebeam Revu and MS Excel, making it easy for the client’s team to understand, verify, and use the information immediately.
Packages used on this bid.
Bidding an envelope package this month?
Send the drawing set and your bid date. An estimator confirms scope before work starts and flags drawing conflicts rather than guessing past them.