Retail Space
Urgent commercial flooring takeoff for a Dallas flooring contractor on a Houston retail facility — carpet, porcelain, ceramic, vinyl, static dissipative tile, and transitions delivered in four hours.
- Location
- Houston, TX
- Client
- Flooring contractor (Dallas, TX)
- Deliverables
- PlanSwift & MS Excel
- Takeoff Time
- 4 hours
Fig. 01 — Project spotlight
What we took off.
Six flooring and wall tile categories quantified against finish plans and schedules, separated with transitions so the contractor could price each finish accurately.
- Porcelain Tile
- Ceramic Tile
- Vinyl Tile (LVT)
- Commercial Carpet
- Static Dissipative Tile
- All Transitions & Trims
What came back.
Materials measured precisely against the architectural schedule, ready to export directly into supplier bid pricing sheets.
- PlanSwift
- Microsoft Excel
The client’s preferred tools and formats. Clean, color-coded takeoff layers.
Four hours from drawings to finished bid.
P2C completed the total takeoff in 4 hours and turned over all deliverables to the client within one day on this urgent, fast-track bid.
The takeoff and supporting documents were completed using PlanSwift and MS Excel, perfectly aligning with the client’s preferred internal workflow.
Speed and Efficiency
P2C completed the total takeoff in just 4 hours, turning over results within a single day to keep tight bidding deadlines on schedule.
Preferred Tools & Methods
The takeoff and supporting documentation were completed in PlanSwift and MS Excel to align with the client’s preferred process.
Accuracy and Reliability
High accuracy in measurements and documentation eliminated errors, avoiding costly adjustments or delays during project execution.
Packages used on this bid.
Bidding a commercial flooring package this month?
Send the drawing set and your bid date. An estimator confirms finish schedules and transition details before work starts, avoiding costly omissions.
