P2C Construction Services #2

Waterproofing Estimating & Takeoff Services | P2C Construction
[ EXISTING GLOBAL WORDPRESS WEBSITE HEADER SHELL ]
TRADE 01 — WATERPROOFING

WATERPROOFING ESTIMATING

Assembly-level takeoffs for below-grade, above-grade, and deck systems — quantified in 24–48 hours.

24–48h
Turnaround
±2%
Accuracy
10
Trades
DIV 07 10 00 Crew applying below-grade waterproofing membrane to a concrete foundation wall on a commercial jobsite

Below-grade foundation membrane installation

OVERVIEW

WHERE WATERPROOFING BIDS FAIL

Specification conflicts and uncounted transitions swallow contractor margins before breaking ground.

01 SPEC CONFLICTS

Details vs Specs

Wall sections call one membrane, specs call another. Swings cost up to 40%.

02 MISSED FOOTAGE

Uncounted Transitions

Reglets, terminations, and drainage boards frequently go uncounted.

03 GUESSED WASTE

Coverage Assumptions

Laps and waste percentages handled by gut feel instead of manufacturer TDS.

04 NO BACKUP

Lack of Audit Trail

No color-coded plan backup when GCs question price changes on bid day.

SCOPE OF WORK

WHAT WE QUANTIFY

Assembly-level takeoffs formatted directly to bid, price, and buyout.

07 10 00

Below-Grade Systems

Foundation walls, mat slabs, and elevator pits by exposed area.

  • Sheet & Fluid
  • Bentonite
  • Drainage Board
07 27 00

Air & Vapor Barriers

Wall area by substrate with transition membranes isolated.

  • Fluid AVB
  • Self-Adhered
  • Opening Detail
07 18 00

Traffic Deck Coatings

Parking structures and plaza decks split by traffic wear course.

  • Vehicular / Pedestrian
  • Ramps & Turns
  • Curbs
07 92 00

Joints & Terminations

Expansion joints, sealant LF, and backer rod counts by width.

  • Expansion Profiles
  • Linear Feet
  • Reglets
07 05 00

Surface Remediation

Grinding, shot blasting, and crack routing isolated for labor.

  • Shot Blasting
  • Crack Routing
  • Moisture Test
01 20 00

Access & Phasing

Lift durations, staging logistics, and building area phasing.

  • Swing Stage
  • Shoring
  • Phasing

BID 2X FASTER

Turnaround in 24–48 hours to chase more opportunities.

BID TIGHTER

Documented coverage math replaces arbitrary padding.

DEFEND SCOPE

Color-coded plan markups prove your numbers to GCs.

SCALE CAPACITY

Surge capacity for bid season without adding fixed overhead.

CLEAN BUYOUT

Quantities map directly into POs and subcontract exhibits.

STAY CONSISTENT

Standardized report formats on every project bid.

PROCESS

HOW WE WORK

Four predictable steps, backed by a named deliverable at every stage.

  1. 01

    Intake

    Submit PDF plans and Division 07 specs. Scope confirmed upfront.

    SCOPE CONFIRMED
  2. 02

    Review

    Details & specs reconciled. Conflicts logged as RFIs before takeoff.

    RFI LOG
  3. 03

    Takeoff

    Assembly-level measurement with color-coded plan markups.

    MARKED-UP PLANS
  4. 04

    Delivery

    Unlocked Excel workbook delivered with a walkthrough call.

    BID PACKAGE
PROJECT PROOF

EXPERIENCE BEHIND THE WORK

Below-grade foundation wall waterproofing membrane installation
182,000 SF · DESIGN-ASSIST

Mixed-Use Podium

Below-grade membrane, mat slab, elevator pits

Parking structure deck receiving traffic coating
340,000 SF · HARD BID

Municipal Garage

Vehicular traffic coating & expansion joints

Plaza deck waterproofing with protection board
46,000 SF · CM AT RISK

Hospital Plaza Deck

Hot fluid-applied membrane & planters

WHY P2C

TRADE-EXPERIENCED ESTIMATORS

We are estimators and project engineers with trade field experience, not data-entry clerks.

  • Waterproofing field & PM background
  • Assembly-level detail, no lump-sum guesses
  • Documented manufacturer coverage rates
  • Color-coded marked-up plan sets included
  • RFI log surfacing drawing conflicts
  • Formats structured directly for buyout
Waterproofing wall section detail drawing with membrane and drainage board callouts
DELIVERABLES

PLANS TO PRECISION

Every quantity is traceable directly to drawing details, sections, and TDS coverage math.

  • Assembly takeoff workbook
  • Color-coded marked-up plan set
  • Assumption & exclusion register
  • RFI log for spec conflicts
  • Labor-hour summary
  • Bid-form summary sheet
MEASUREMENT
Exposed Area / LF
SOFTWARE
OST & Bluebeam
FORMATS
Unlocked Excel & PDF
COVERAGE
Per Manufacturer TDS
FAQ

FREQUENT QUESTIONS

PDF drawing set, Division 07 specs, and any addenda.

Standard waterproofing packages are delivered in 24–48 hours.

Both. Takeoff-only or complete estimates including labor and material.

Addenda revisions are tracked against prior takeoffs with deltas highlighted.

Yes, unlocked Excel and CSV files import directly without rekeying.
NEXT STEP

READY TO BID YOUR NEXT PROJECT?

Upload your drawings. We confirm scope and pricing before work starts.

Scroll to Top